Hollister Construction Company, General Contractor

Office: (714) 632-1800

 

 

4065 E. La Palma Avenue Suite C

Anaheim, CA 92807

FEATURED PROJECT

 

WW Grainger

Branch No. 312

Fresno, California

 

The project was awarded to Hollister Construction Company as a Design-Build (D/B) project. It was one of many Design-Build engineering projects of this type completed for

WW Grainger. Our in-house staff designed the construction drawings to meet

WW Grainger’s corporate specifications, and to comply with the City of Fresno Development Department requirements.

 

The project was a two-phased project to allow the branch to remain open for business during construction. Our crews worked two shifts per day and on weekends to meet Grainger’s schedule.

 

The scope of work included demolishing a 15,035 SF asphalt concrete parking lot, installing new storm drain piping, exterior light poles, curbs, compaction, and laying a new asphalt concrete parking lot.

 

Similar Design-Build parking lot projects were recently completed for WW Grainger in the following cities:

 

• Billings, Montana

• Salinas, California

• Spokane, Washington

• Tucson, Arizona

 